OVERVIEW

Source Civil Ltd was appointed as the civil contractor by CSL on behalf of Irish Water to carry out works to upgrade Drumconrath WWTP as part of the scope of works a new bridge was to be constructed in place of an old structure deemed inadequate to carry traffic leading into the wastewater treatment plant.

SUMMARY

  • The works consisted of the following:
  • Replacement of a Bridge to access the plant consisting of:
    o 8No. H Piles Driven 16m into the ground
    o Pile Cap and Banking Seat
    o 6m Span Precast beams
    o Run off and approach slabs
  • Vegetation removal and site clearance
  • Abutment replacement
  • Bridge Demolition
  • Over-pumping / Flume works
  • Temporary works for utilities and sewers during construction
  • Temp works Design
    Cranage and lifting plan design
  • Civil Design of RC works
  • River bed clearances and re-grading
  • Traffic Management design and implementation
  • Re-installation of Scour protection using Rock Armour to both up and
    downside of the new structure