OVERVIEW

Source Civil Ltd was appointed as the specialist Civil contractor to carry out all Civil and structural works required to construct a 38kv Substation supplying K2 Data Centre. Following the success of this Contract we were appointed specialist Civil and structural contractor for phase 2 which comprised of a 150m2 ESB substation.

Summary of the project

During This project, Source Civil were responsible for the following:

  • Implementation of Storm Water and Land Drainage Systems.
  • Installation of a Petrol Interceptor
  • Construction of Two Reinforced Concrete Transformer Bunds.
  • Construction of Five Reinforced Concrete Blast walls reaching 8M high.
  • Construction of a 50m2 Reinforced Concrete PEC Building foundation
    consisting of a Reinforced concrete base, Ten Reinforced concrete
    columns, Ten Reinforced concrete wall infills with over 30 duct
    penetrations.
  • Installation of Earthing grid throughout the site.
  • Errection of 200m of Palisade Fencing
  • Installation of Over 300m of Ducting ranging from 50mm to 160mm
  • Graded Stone finishes with teram underlay throughout the site.