OVERVIEW

Source Civil Ltd was appointed as the specialist Civil contractor to carry out all Civil works required to construct a 38kv Substation supplying K2 Data Centre.

Summary of the project

This project is a 150m2 38Kv Substation connecting K2 Data Centre to the ESB grid.

SCL scope of works on this project included:

  • Excavation and disposal for strip foundations and pouring 300mmdeep foundation.
  • RC Works and waterproofing 1.5m deep cable pit, to accommodate cables serving the switchgear Room
  • Construction of the 4m high rising walls
  • Foul and Storm Drainage
  • Installing 60m of palisade fencing and concrete plinths.
  • Pouring 50m of perimeter ring beam
  • Installation of 150m2 of 200mm Hollowcore slabs
  • 300m2 of external plasterwork
  • Install of truss roof and slating.
  • Internal and ESB Spec external doors
  • Internal fitout, including GRP raised access floor, plumbing
  • Pouring 50m of footpath to perimeter
  • Grading and stoning up site wide.