OVERVIEW

Source Civil Ltd was appointed as the specialist civil contractor by the Kirby Group working on behalf of Microsoft to carry out construction of all groundworks and reinforced concrete works in the construction of 2 number 110kV underground grid line circuits, 2 number 110 kV/10kV customer transformers with blast wall, and 10kV customer substation in an existing ESB substation.

Summary of the project

  • Carry out site investigation & Traffic Management
  • Carry out a full topographical survey
  • Construction of large 110kv Transformer Insitu Concrete bund including 7m
    high reinforced concrete blast wall
  • Construction of a new Substation building 5m x 13m in size
  • Resurfacing of existing tarmac substation access routes
  • Extensive excavation and ground support to existing infrastructure
  • Interface and liaison with ESB and Data Centre staff