METELAN BESS
Metelan, Germany | Battery Energy Storage System | Completed
Source Ltd was appointed by H&MV, acting on behalf of SMA Group, to deliver the civil and high-voltage infrastructure for a state-of-the-art 231 MWh Battery Energy Storage Facility in Metelen, Germany.
Our scope included the full turnkey delivery of the plant’s enabling works, foundation systems, duct networks, and supporting electrical infrastructure, including a new high-voltage substation.
Site Preparation & Civil Works
Full site investigation, enabling works & bulk excavation to formation
Placement of sub-base stone and formation build-up for equipment platforms
Ducting & Grid Infrastructure
5,000m of LV, MV and fibre ducting with 20 precast chambers
2,000m MV grid route, including 500m of directional drilling under a live roadway
Structural Foundations
700 precast concrete plinths (700×700×700mm) for battery and inverter units
Construction of 2 modular building basements
Transformer bund for 100-tonne transformer installation
Site Systems & Perimeter Works
71 acoustic wall foundations (1.9m × 1.9m × 0.8m)
Installation of storm and foul drainage
500m security fence with 3 access gates