STRUBBEL BESS

Strubbel, Germany | Battery Energy Storage System | Completed

Source Continental Ltd was appointed by H&MV, on behalf of Aquila Capital, as the specialist civil contractor for the development of a 50 MW Battery Energy Storage substation in Strubbel, Germany.
Our scope included delivery of all reinforced concrete infrastructure for the substation, alongside installation of extensive underground ducting networks linking the existing substation to the new BESS campus.

Pre-Construction & Surveying
  • Detailed site investigation

  • Full topographical survey of the development area

Ducting & Cable Infrastructure
  • Installation of 400m of 200mm HV ducting

  • Installation of 2,000m of 160mm MV ducting

  • Placement of large precast pulling chambers throughout the site for future cable installation

Structural & RC Works
  • Construction of an in-situ concrete bund for a 110kV transformer

  • Civil foundations for the installation of a precast modular building