STRUBBEL BESS
Strubbel, Germany | Battery Energy Storage System | Completed
Source Continental Ltd was appointed by H&MV, on behalf of Aquila Capital, as the specialist civil contractor for the development of a 50 MW Battery Energy Storage substation in Strubbel, Germany.
Our scope included delivery of all reinforced concrete infrastructure for the substation, alongside installation of extensive underground ducting networks linking the existing substation to the new BESS campus.
Pre-Construction & Surveying
Detailed site investigation
Full topographical survey of the development area
Ducting & Cable Infrastructure
Installation of 400m of 200mm HV ducting
Installation of 2,000m of 160mm MV ducting
Placement of large precast pulling chambers throughout the site for future cable installation
Structural & RC Works
Construction of an in-situ concrete bund for a 110kV transformer
Civil foundations for the installation of a precast modular building