OVERVIEW
The works consisted of 1.5km of 630mm OD HDPE SDR21 Foul pumping main pipe which had to be tied into points both sides of the A92 Road 5m below ground and at each end of the site. Temporary works were carried out namely sheet piles to gain access to tie in locations.
The project was essentially split into two sections north and south or the road. A 200m section was slip lined using an existing 730mm ID Ductile Iron pipe. Wash out chambers and Air Valves were part of the works also.