OVERVIEW

Source were appointed to carry out all civils works to the Design & Build of an upgrade to the existing Waste Water Treatment Plant at Hacketstown, through the provision of a new SBR Process waste water treatment plant on the same site as the existing live plant.

SUMMARY

The works comprised of the following:

  • New Wastewater Treatment to serve a population equivalent of 2,000.
  • Bulk Earthworks for SBR Tank Construction
    In Situ Concrete SBR
  • Tanks 12.5m wide X 19.9m long X 5m high
    In Situ Concrete Storm tank and inlet buffer tank 12.45m long X
  • 5.8m wide x 5m high.
    Construction of 60m2 office / administration
  • Control Building space.
    Ancillary works including access roads, footpaths, fencing and landscaping.
  • Demolition of existing wastewater treatment works.
  • 8 no. Reed Beds for tertiary treatment totaling 2350m2 were to allow sufficient drying
    time before removing the treated/dewatered sludge.