OVERVIEW
Source Civil Ltd was appointed as the main contractor to carry out works to various sections of pipelines throughout Sligo Town centre. Source Civil was responsible for the roles of PSCS, PSDP, Designer and Main Contractor. The works involved installation of pipework in dual trenches from 400mm diameter to 150m diameter.
SUMMARY
- Phase 1 – Site Investigation Works
- Carry out site investigation &
- Traffic Management
- Carry out a full topographical survey
- Update the proposed route on the Indicative
- Design Drawings
- Design connection details
- Produce a Design Risk Assessment (DRA)
- Carry out Value Engineering Workshops to minimise costs to client
Phase 2 – Mains Rehabilitation Works
Laying of the following SDR 17 PE100 Water main by means of both Open - Cut and Horizontal Directional Drilling:
o 1km of 180mm dia – Ballinode to Kilsellagh (HDD)
o 980m of 315mm dia – The Mall to Ballinode
o 980m of 180mm dia – The Mall to Ballinode - 75No. House connections and water meters
- 50No. House connections PRV’s
- Bulk meters and PRVs
Dealing with PAH materials - Working alongside a school and a Major Hospital
- Traffic Management
- Replacement of the existing service pipes
- Construction of new chambers;
- Testing and sterilisation of the new water mains